PM/360 Models, Methods, and Artifacts sample papers, week by week

Reviewed by Davina Cresswell, MBA · Models, Methods, and Artifacts · University of Phoenix · Free custom samples in 24–48h

PM/360 surveys the tools project managers use. Five weekly samples cover situational and change models, estimating and scheduling methods, data gathering and analysis methods, planning and tracking artifacts and choosing tools across performance domains.

Send the exact assignment or rubric from your classroom and a custom sample written to it lands in 24 to 48 hours, the first one free. PM/360 is Phoenix’s Models, Methods, and Artifacts course. It explores models, methods and artifacts commonly used in managing projects and gives students practice applying them across performance domains to support project requirements. Searches like "pm/360 week 3 assignment example", "PM360 sample paper", and "PM 360 week samples" land on this page.

What PM/360 is really about

A model explains a situation, a method produces a result and an artifact records it. PM/360 covers models such as situational leadership, Tuckman's team stages and ADKAR, methods such as analogous and three-point estimating, root cause analysis and decision trees and artifacts such as charters, backlogs, risk registers, issue logs and status reports.

Students commonly apply a model to a team or change situation, estimate durations and costs with two methods, analyze data from a case, build several artifacts and write a justification for the tool set chosen for a project.

What PM/360’s assessments ask for

Instructors look for tools used correctly and for the right purpose, estimates with stated assumptions and artifacts complete enough to use. The justification should explain why each tool fits the project's size, uncertainty and stakeholders.

Where students lose points in PM/360

Students lose points when artifacts are templates with blank fields, when estimates give a single number without a range or when tools are chosen because they are familiar rather than suitable. Overloading a small project with paperwork is another weak spot.

The PM/360 drawers

Wk 1

PM/360 Wk 1 assignment example

Wk 1 usually introduces models for people and change. On request, free, 24-48h.

Request it free →
Wk 2

PM/360 Wk 2 assignment example

Wk 2 typically applies estimating and scheduling methods. On request, free, 24-48h.

Request it free →
Wk 3

PM/360 Wk 3 assignment example

Wk 3 often uses data gathering and analysis methods. On request, free, 24-48h.

Request it free →
Wk 4

PM/360 Wk 4 assignment example

Wk 4 commonly builds planning and tracking artifacts. On request, free, 24-48h.

Request it free →
Wk 5

PM/360 Wk 5 assignment example

Wk 5 closes with selecting tools across domains. On request, free, 24-48h.

Request it free →
Different?

Your classroom shows something else?

University of Phoenix revises courses; week counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a PM/360 sample the right way

Tell us the project and the tools your prompt names, and the free sample fills each artifact with real content.

How these samples are written

Every sample in this stack is written the way the custom ones are: the instructions decoded first, a subject-matched writer drafting to the rubric, format checked line by line. Phoenix runs several course models, weekly letter-graded, competency-based, and directed-study, so a custom request is always written to what YOUR classroom shows, never from a stale template.

PM/360 questions, answered

What is three-point estimating?

Estimating from optimistic, most likely and pessimistic values, often averaged to reflect uncertainty.

What is an issue log?

A record of current problems on a project with owners, actions and due dates.

What is the ADKAR model?

A change model describing awareness, desire, knowledge, ability and reinforcement for each person affected.