Seventy-Two Hours of Temperature Mapping Before the First Pallet: Estimating and Scheduling a Food Bank's Eight-Week Move
[Student Name]
University of Phoenix
PM/360: Models, Methods, and Artifacts
Week 2 Assignment
[Instructor Name]
[Date]
Valley Harvest Food Bank, its tasks, estimates and dates are composites written for a model paper.
The Week 1 paper introduced Valley Harvest Food Bank, an invented Fresno, California, nonprofit moving into a new refrigerated building and switching from paper pick lists to scanners. Inés Carrillo, who manages the project, must finish the move inside eight weeks and cannot miss a single delivery to the 210 partner pantries. This paper selects estimating and scheduling methods for the move's tasks, applies them and explains how the team guarded its estimates against optimism.
Choosing Methods for Tasks
The current standard presents estimating and scheduling methods as options to be selected for each situation, noting that the right method depends on the information available, the type of work and the level of uncertainty (Project Management Institute [PMI], 2021). The move contains several kinds of work: repetitive truck moves, a stock transfer tied to cold-chain rules, installation tasks with uncertain durations and software configuration whose content is still being discovered. Each gets a different method.
Analogous Estimate for Dry Goods
Valley Harvest moved part of its dry goods to an overflow warehouse in 2021, shifting 620 pallets in 11 working days with two trucks and a crew of six. The new move involves about 1,900 pallets of dry goods over a similar distance. Scaling by pallet count gives about 34 working days for two trucks, or 17 days with four trucks, which the food bank can rent. Analogous estimating is quick and suits repetitive work, but it assumes the past job was similar. The new building's dock is larger, so the team expects the actual figure to be somewhat lower.
Bottom-Up Estimate for Cold Stock
Refrigerated and frozen stock must move fast to protect the cold chain. The team counted current inventory, about 260 pallets in coolers and 140 in freezers, and estimated each step: loading a refrigerated truck with 22 pallets takes about 40 minutes, the 9-mile trip about 25 minutes and unloading into a cold room about 35 minutes. With two refrigerated trucks in rotation, a truck can complete four or five round trips in a ten-hour day, so the pair can manage nine or ten loads; 400 pallets need 19 loads, or about two days. Building the estimate from the smallest pieces fits work where each step is known and timing matters.
Three-Point Estimate for Racking
Racking installation in the new building depends on a contractor and on inspections, so its duration is uncertain. The team estimated an optimistic 8 working days, a most likely 11 and a pessimistic 18, the last allowing for a failed seismic inspection, which California requires for high racking. The weighted estimate is (8 + 44 + 18) / 6, or about 11.7 days, with a standard deviation of about (18 minus 8) / 6, or 1.7 days. The schedule uses 12 days and holds 3 days of buffer before stock transfer begins.
Relative Estimates for System Configuration
The warehouse management system needs configuration: location codes, pick paths, label formats, partner agency order rules and reports. The vendor's consultant, the warehouse leads and the inventory manager sized 26 configuration items using relative points, comparing each with a reference item, the label format, set at 3 points. The total came to 94 points. Based on the vendor's experience with similar clients, the team expects to complete about 20 points a week, suggesting about five weeks. Jørgensen (2004) reviewed studies of expert estimation of software effort and found that expert judgment was often as accurate as formal models, and that combining estimates from several experts tended to improve accuracy; the group sizing session follows that advice.
An estimate made by one person in a hurry is a guess with a number attached.
Building the Schedule
The schedule links tasks by their dependencies. The longest chain runs through the cold rooms: refrigeration commissioning by the contractor (5 days), followed by temperature mapping, which requires 72 hours of logged readings showing every zone holds temperature, then a food safety review (1 day), then cold stock transfer (2 days), then the first pantry orders filled from the new building. Racking (12 days plus buffer) must also finish before dry goods move, and system configuration must finish before the parallel run. Working these chains forward from the project start shows that cold-room commissioning, mapping and stock transfer, together with racking for the cold rooms, form the critical path, leaving the dry goods move and volunteer training with float.
Leveling the Volunteer Peak
The first schedule placed volunteer scanner training, the dry goods move and the first week of pantry picking in week 5, requiring about 140 volunteer shifts in a week when the food bank usually fills 90. Training had float, so the team moved half of it to weeks 3 and 4 in the old building using a practice scanner kit. The peak dropped to about 100 shifts, within reach with a recruitment push.
Compressing One Path
The board wanted the cold rooms in use before the summer stone-fruit harvest, which would bring large donations from growers. The team fast-tracked by starting racking in the dry storage area while refrigeration commissioning was still under way in the cold rooms, since the two use different crews and areas. The risk is congestion and rework if the contractors interfere with each other, so a daily site coordination call was added. Crashing the temperature mapping was not possible: the 72-hour requirement is fixed.
Guarding Against Optimism
Buehler et al. (1994) showed in a series of studies that people predict their own tasks will finish sooner than they actually do, even when they know similar tasks ran late before. The team used three habits to counter this. Estimates were made by the people who would do the work, then compared with records from the 2021 move. Ranges, not single points, were used for uncertain tasks. And for each estimate, the team asked what went wrong last time and whether it could happen again.
Conclusion
Valley Harvest's move uses each estimating method where it fits: analogy for repetitive truck moves, bottom-up counting for cold stock, three points for uncertain racking and relative points for system configuration. A dependency-based schedule shows that the cold rooms drive the finish, leveling smooths a volunteer peak and fast tracking brings the cold rooms forward while the fixed mapping period stays untouched. Grounding estimates in records and ranges keeps the eight-week plan honest.
References
Buehler, R., Griffin, D., & Ross, M. (1994). Exploring the "planning fallacy": Why people underestimate their task completion times. Journal of Personality and Social Psychology, 67(3), 366-381. https://doi.org/10.1037/0022-3514.67.3.366
Jørgensen, M. (2004). A review of studies on expert estimation of software development effort. Journal of Systems and Software, 70(1-2), 37-60. https://doi.org/10.1016/S0164-1212(02)00156-5
Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.). Project Management Institute.
What the PM 360 Week 2 instructions ask
In the second PM 360 assignment, students are generally asked to describe estimating and scheduling methods and apply them to a project. Prompts may list methods such as analogous, parametric, bottom-up and three-point estimating, expert judgment, relative estimating for agile work, the critical path method, rolling wave planning, resource leveling and schedule compression through crashing or fast tracking. You may be asked to recommend methods for a scenario or to produce a short estimate and schedule. Show your calculations, explain why each method suits its task and note the limits of your estimates. Cite the standard and scholarly sources on estimation or scheduling in APA format.
How this PM 360 Week 2 example is built
This sample gives the move's tasks the estimating method each deserves. Truck moves of dry goods are estimated by analogy with the food bank's last relocation; cold-room stock is estimated bottom-up from pallet counts; and installation of racking, whose duration is uncertain, gets a three-point estimate. Configuration work for the new warehouse system is sized by the vendor and staff together using relative points. The schedule section traces the dependency chain from cold-room commissioning and temperature mapping through the transfer of refrigerated stock, identifies the longest path and finds a week-five volunteer peak, which is leveled by moving training earlier. One path is fast-tracked. A closing section explains how the team protected its estimates from optimism.
PM 360 Week 2 grading rubric: where the points go
Graders expect accurate descriptions and sensible application, and they read the numbers closely. Top papers match methods to tasks based on the information available, show estimates with their inputs and arithmetic and build a schedule with explicit dependencies that reveals the critical path. Credit goes to papers that address resource limits and explain compression choices and their risks. Recognizing bias in estimates and taking steps to reduce it shows maturity. Research on estimation accuracy or scheduling practice strengthens the analysis, especially when it explains why the team's own figures might be too low. A short note on what the estimates exclude, such as weather or contractor delays, also earns credit. A logical structure, readable lists of tasks and durations, consistent numbers and correct APA formatting complete a high score.
PM 360 Week 2 help: mistakes to avoid
Long descriptions of every method followed by one rough estimate are a frequent pattern. Apply at least three methods to different tasks and show the numbers. Another common error is presenting a schedule as a list of dates without dependencies, so no one can see what drives the finish. Name the predecessor of each key task. Students also confuse crashing, which adds resources to shorten a task, with fast tracking, which overlaps tasks that were planned in sequence. Explain the risk each creates. Many estimates ignore resource limits, especially for volunteer or shared staff. Finally, acknowledge uncertainty; a single-point estimate with no range implies false precision. A tutor can review your network diagram for missing dependencies.
Related PM 360 sample papers
Other PM 360 week samples
- PM 360 Week 1: Models for People and Change
- PM 360 Week 3: Data Gathering and Analysis
- PM 360 Week 4: Planning and Tracking Artifacts
- PM 360 Week 5: Selecting Tools Across Domains
More BS in Business sample papers
- PM 300 Week 2: Applying the Principles
- PM 310 Week 2: Building and Leading the Team
- PM 340 Week 2: Delivering Scope and Quality
- PM 350 Week 2: Phases and Methodologies
PM 360 Week 2 questions, answered
What does PM 360 Week 2 usually cover?
It usually covers estimating and scheduling methods: analogous, parametric, bottom-up, three-point and relative estimating, the critical path method, rolling wave planning, resource leveling and schedule compression.
Where can I find a free PM 360 Week 2 sample paper?
The Week 2 paper above estimates and schedules a food bank's eight-week move into a refrigerated distribution center, and anyone may read every word of it without paying.
What is the difference between crashing and fast tracking?
Crashing shortens a task by adding resources, usually at extra cost. Fast tracking shortens the schedule by doing tasks in parallel that were planned in sequence, which adds the risk of rework.
What is relative estimating?
A method, common in agile work, in which a team sizes tasks against one another using points or sizes rather than hours, often through group discussion such as planning poker.
What is resource leveling?
Adjusting a schedule so that demand for a resource does not exceed what is available, often by delaying tasks with float, which can lengthen the project if critical tasks are affected.
Write yours, or have the desk draft it
This paper is an original model document written by our desk, not a submitted student paper and not an official University of Phoenix document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.