PM/340 Project Delivery and Measurement sample papers, week by week

Reviewed by Davina Cresswell, MBA · Project Delivery and Measurement · University of Phoenix · Free custom samples in 24–48h

PM/340 examines how project work is delivered and measured. Five weekly samples cover managing project work, delivering scope and quality, measuring performance against baselines, earned value and dashboards and managing uncertainty.

Send the exact assignment or rubric from your classroom and a custom sample written to it lands in 24 to 48 hours, the first one free. PM/340 is Phoenix’s Project Delivery and Measurement course. It gives an overview of project delivery and measurement, focusing on the project work, delivery, measurement and uncertainty performance domains. Searches like "pm/340 week 3 assignment example", "PM340 sample paper", and "PM 340 week samples" land on this page.

What PM/340 is really about

Once a plan is approved, the manager's job shifts to keeping work flowing, delivering what was promised and knowing early when the project is drifting. PM/340 covers procurement and resources during execution, requirements and quality, baselines, key performance indicators, earned value and responses to risk and ambiguity.

Students commonly analyze how work is managed on a case project, assess delivery of scope and quality, set measures and a dashboard, calculate earned value indicators and write a plan for managing uncertainty.

What PM/340’s assessments ask for

Instructors look for measures that are specific and tied to objectives, earned value calculations done correctly and interpreted and uncertainty responses matched to the type of risk. Dashboards should show trends and thresholds, not just current values.

Where students lose points in PM/340

Students lose points when metrics count activity rather than results, when earned value numbers are calculated but not explained or when risk responses are generic. Confusing quality assurance with quality control is a frequent slip. State the baseline each measure is compared with. When a project shows a cost or schedule problem, the paper should say what the manager would do next, who must approve it and how the change would be recorded.

The PM/340 drawers

Wk 1

PM/340 Wk 1 assignment example

Wk 1 usually introduces the project work domain. On request, free, 24-48h.

Request it free →
Wk 2

PM/340 Wk 2 assignment example

Wk 2 typically addresses delivery of scope and quality. On request, free, 24-48h.

Request it free →
Wk 3

PM/340 Wk 3 assignment example

Wk 3 often sets measures and baselines. On request, free, 24-48h.

Request it free →
Wk 4

PM/340 Wk 4 assignment example

Wk 4 commonly applies earned value and dashboards. On request, free, 24-48h.

Request it free →
Wk 5

PM/340 Wk 5 assignment example

Wk 5 closes with managing uncertainty. On request, free, 24-48h.

Request it free →
Different?

Your classroom shows something else?

University of Phoenix revises courses; week counts and deliverables shift between terms. Send what your classroom shows and the desk matches it exactly.

Send it over →

Using a PM/340 sample the right way

Send the project data your course provides, and the free sample calculates and interprets the performance measures.

How these samples are written

The discipline behind every paper here: instructions are the outline, worksheets get filled exactly, decks get outlined slide by slide, and the one-course-at-a-time rhythm means your one course gets the whole desk. Send your week's instructions with a request and the sample matches them, revisions included.

PM/340 questions, answered

What does CPI mean?

The cost performance index, earned value divided by actual cost; below 1.0 means the project is over budget.

What is a baseline?

The approved version of scope, schedule or cost against which actual performance is compared.

How do quality assurance and quality control differ?

Assurance checks that the right processes are followed; control inspects deliverables for defects.