| Course | MGT 571 Staffing, Leading and Controlling for Agile Environments (MGT/571) |
|---|---|
| Week | 2 |
| Paper type | Agile staffing plan |
| Length | about 1,171 words, 4 double-spaced pages plus title page and references |
| Format | APA 7 student paper |
| School | University of Phoenix |
| Program | MBA |
| Updated | October 2026 |
Free sample paper for MGT 571 Week 2
Who Belongs on an Agile Product Team? Staffing Cross-Functional Teams at Tippecanoe Orthopedic Systems
[Student Name]
University of Phoenix
MGT/571: Staffing, Leading and Controlling for Agile Environments
Week 2 Assignment
[Instructor Name]
[Date]
Tippecanoe Orthopedic Systems and all staffing data are composites written for a model paper.
Tippecanoe Orthopedic Systems, the composite implant maker in Warsaw, Indiana, has decided to start agile teams for its surgical planning software and two surgical instrument projects. Its 180 engineers and developers are organized by function: mechanical engineering, software, testing, quality and regulatory affairs. Staff are assigned to projects by department heads, often to several projects at once. Agile methods change how work is organized, but the people on the team, and whether they can work across their specialties, decide whether those methods succeed. This paper designs Tippecanoe's staffing for agility.
Roles in an Agile Team
Agile teams need a product owner, who represents users and sets priorities; a team facilitator, sometimes called a scrum master, who removes obstacles; and team members who build, test and document the product. In a regulated setting, quality and regulatory expertise must be part of the team rather than a later checkpoint.
Team Composition for Software
The planning software team will include a product owner with surgical workflow knowledge, five software developers, a user experience designer, a software test engineer, a quality engineer and a part-time regulatory specialist, nine people in total.
Team Composition for Instruments
Each instrument team will include a product owner, three mechanical engineers, a manufacturing engineer, a test engineer, a quality engineer and a regulatory specialist shared with another team, eight people per team.
Evidence on Team Design
Mathieu et al. (2008) reviewed a decade of research on team effectiveness and highlighted the importance of team composition, shared understanding, stable membership and supportive context. Teams whose members work together over time develop coordination and trust. Tippecanoe will keep team membership stable for at least a year rather than reshuffling engineers among projects.
Dedicated Members
Agile teams work best when members are dedicated. Engineers now split time across three or four projects, losing time to switching. Team members will be assigned full time, which means other projects must be paused or staffed differently.
Skills Gap Analysis
A skills inventory found that Tippecanoe has strong mechanical engineers and capable developers but only two people with product owner experience, few quality engineers comfortable reviewing work every two weeks and no user experience designers. Most engineers have deep skills in one area; few have the broader, T-shaped profiles that help cross-functional teams.
Closing the Gaps Internally
Senior engineers with surgeon relationships will be trained as product owners. Quality engineers will learn to integrate design control activities into sprints. Engineers will receive cross-training in testing and documentation. Developing people internally preserves knowledge of Tippecanoe's products and regulatory history.
Employment Arrangements
Cappelli and Keller (2013) classified work arrangements, from direct employment to contracting and staffing through agencies, and noted that each carries different control, cost and legal implications. Tippecanoe can hire employees, use individual contractors, use agency staff or partner with a software firm.
Comparing the Options
Employees build long-term knowledge and are best for roles involving regulated design history. Contractors and agency staff add capacity quickly for specialized tasks, such as user experience design, but leave with their knowledge. A software partner could build parts of the planning tool but would require careful oversight of quality documentation.
Recommended Mix
Product owners, quality engineers, regulatory specialists and most developers will be employees. A user experience designer and two developers will be contracted for the first year while a permanent designer is hired. No regulated design decisions will be made solely by contractors.
Legal Considerations
Contractors must be classified correctly. Workers who are controlled like employees, work full time on core functions and are economically dependent on Tippecanoe may be employees under federal and state law, regardless of contract labels. Agency arrangements also create joint employer questions. Contracts will define deliverables and limit day-to-day control.
Hiring for Agile Roles
Agile work requires collaboration, communication and learning alongside technical skill. Sackett et al. (2022) found that structured interviews and work samples are among the most valid selection tools. Candidates for agile roles will complete a structured interview with behavioral questions about collaboration and changing priorities and a work sample, such as reviewing a user story and proposing tests.
An Internal Talent Marketplace
To move people quickly, Tippecanoe will create an internal marketplace listing team openings and stretch assignments. Engineers can apply to move between teams at quarterly planning points, with managers unable to block moves without cause. This builds resource fluidity.
What Dedicated Teams Displace
Assigning 26 people full time to three agile teams removes them from other work. A portfolio review identified seven lower-priority projects, mostly minor instrument updates, that will pause for six months, and two that will be completed by a contract engineering firm under Tippecanoe's quality system. Leaders chose this tradeoff deliberately: spreading engineers across many projects had been one cause of three-year development times.
Workforce Planning for Flexibility
Agility requires the ability to shift people as priorities change. Tippecanoe will plan its engineering workforce with a core of permanent staff sized for steady demand and a flexible layer of about 10 percent drawn from contractors and partners for peaks. Quarterly portfolio reviews will decide where the flexible layer goes. Cross-training also adds flexibility: an engineer who can test as well as design can move to wherever the bottleneck is.
Onboarding Into Teams
New and transferring team members will complete a two-week onboarding that covers agile practices, the team's product and the design control procedures that apply to sprint work. Pairing newcomers with experienced team members for their first sprints speeds learning and reinforces the collaborative norms agile teams need.
Supporting Functions
Agile teams depend on quality, regulatory, manufacturing and supply functions outside the teams. Those functions will assign liaisons to each team and adjust their workloads for faster review cycles.
Diversity and Fairness in Team Staffing
Moving to dedicated teams creates new opportunities, and the way people are chosen matters. If department heads pick their favorites, existing networks will decide who joins the most visible projects. Openings will be posted in the internal marketplace with clear criteria, and selection panels will include members from outside the hiring department. Monitoring who applies and who is selected, by gender, age and other characteristics, will show whether the new teams draw from the whole engineering workforce.
Measuring Staffing Success
Staffing measures include time to fill team roles, the share filled internally, team stability over twelve months, engineer engagement scores and retention of team members. Early results will be compared with the previous functional model to see whether dedicated teams improve both speed and satisfaction.
Career Paths
Engineers worry that leaving functional departments will hurt their careers. Tippecanoe will create technical career ladders that recognize team contributions and product owner roles as paths to leadership.
Conclusion
Agile teams at Tippecanoe will include product, engineering, testing, quality and regulatory roles, with stable, dedicated members. Internal development will close most skill gaps, contractors will fill short-term needs and employees will hold regulated knowledge. Valid selection, an internal marketplace and clear career paths support the flexibility agility requires.
References
Cappelli, P., & Keller, J. R. (2013). Classifying work in the new economy. Academy of Management Review, 38(4), 575-596. https://doi.org/10.5465/amr.2011.0302
Mathieu, J., Maynard, M. T., Rapp, T., & Gilson, L. (2008). Team effectiveness 1997-2007: A review of recent advancements and a glimpse into the future. Journal of Management, 34(3), 410-476. https://doi.org/10.1177/0149206308316061
Sackett, P. R., Zhang, C., Berry, C. M., & Lievens, F. (2022). Revisiting meta-analytic estimates of validity in personnel selection: Addressing systematic overcorrection for restriction of range. Journal of Applied Psychology, 107(11), 2040-2068. https://doi.org/10.1037/apl0000994
What the MGT 571 Week 2 instructions ask
The second MGT 571 assignment commonly asks graduate students to develop a staffing approach that supports agility. Typical requirements include analyzing the skills and roles agile work requires, team composition and size, workforce planning that allows resources to shift, the mix of permanent employees and contingent workers, selection methods for agile roles, internal mobility and legal and ethical staffing considerations. Some prompts ask students to address specific teams. Tie staffing choices to the type of agile work, use research on teams, work arrangements and selection, and cite sources in APA format. A roster for each proposed team, with roles and whether each is filled internally or externally, makes the plan concrete.
How this MGT 571 Week 2 example is built
Agile teams fail when they are staffed like functional departments, and the paper staffs Tippecanoe's first teams differently. Each team needs a product owner, engineers with broad skills, a software tester, a quality engineer and a regulatory specialist. Team effectiveness research supports stable teams of seven to nine. A skills inventory shows too few product owners and quality engineers comfortable with iterative work. The paper compares hiring employees, using contractors and partnering with a software firm, and recommends a mix that keeps regulated knowledge inside. Hiring adds work samples and structured interviews, an internal marketplace lets engineers move between teams and the paper explains which lower-priority projects pause to free dedicated staff.
MGT 571 Week 2 grading rubric: where the points go
Strong agile staffing papers connect roles and team design to the kind of work and use evidence to make choices. Faculty credit clearly defined roles, team composition supported by team research, a skills gap analysis, a careful comparison of employment arrangements with attention to knowledge retention and legal risk, selection methods suited to collaborative and adaptive work and mechanisms for moving people quickly. Considering how staffing affects functions outside the agile teams shows systems thinking. A team roster table and correctly formatted APA references finish the paper. Credit also goes to a plan to pause or restaff the work that dedicated team members leave behind, since assigning engineers full time to agile teams pulls them off other projects, and ignoring that tradeoff makes a staffing plan look easier than it is.
MGT 571 Week 2 help: mistakes to avoid
Students often recommend hiring agile coaches without addressing the rest of the team. Define every role. Another frequent gap is ignoring the functions agile teams depend on, such as quality or legal. Staff them too. Students also treat contractors as interchangeable with employees. Consider knowledge retention, control and classification law. Avoid hiring only for technical skill; agile work requires collaboration and learning. Use valid selection methods. Plan how people will move between teams. Finally, consider how staffing changes affect employees' careers, since uncertainty about roles drives resistance. Explain what happens to projects that lose people to the new teams.
Related MGT 571 sample papers
Other MGT 571 week samples
- MGT 571 Week 1: Agile Environments
- MGT 571 Week 3: Leading Teams Through Change
- MGT 571 Week 4: Legal and Ethical Considerations
- MGT 571 Week 5: Controls and Agile Metrics
- MGT 571 Week 6: Strategic Execution
More MBA sample papers
- MGT 521 Week 2: Planning and Organizational Structure
- MGT 526 Week 2: Change Models and Sources of Resistance
- MGT 566 Week 2: Analyzing the Organization
- MGT 576 Week 2: Evaluating Opportunities
MGT 571 Week 2 questions, answered
What does MGT 571 Week 2 usually cover?
It usually covers staffing for agility: roles and skills agile teams need, team composition, flexible workforce planning, employees versus contingent workers, selection methods, internal mobility and legal considerations.
Where can I find a free MGT 571 Week 2 sample paper?
The complete agile staffing plan for a medical device company, with team designs and notes, is on this page. Share your prompt to receive a free starting draft.
How large should an agile team be?
Many agile frameworks recommend small teams of about five to nine members, large enough to include needed skills and small enough to coordinate easily and share responsibility.
What is a T-shaped skill profile?
Deep expertise in one area combined with broad enough knowledge of related areas to collaborate across disciplines and take on adjacent tasks, which suits cross-functional teams.
Should agile teams use contractors?
Contractors can add specialized skills or capacity, but core knowledge, especially in regulated work, is usually better kept with employees, and contractor arrangements must comply with classification laws.
Write yours, or have the desk draft it
This paper is an original model document written by our desk, not a submitted student paper and not an official University of Phoenix document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.
Request this one custom, free · All MGT 571 week samples · All courses