PSYCH 668 Week 6 OD Interventions and Evaluation Example

Reviewed by Queenie Halstead, MA · University of Phoenix · Updated

This PSYCH 668 Week 6 example turns last week's turnover diagnosis at a produce distributor into an organization development intervention plan, combining structural changes to scheduling and attendance with supervisor development and crew-level team building, and builds in an evaluation that can show whether the changes worked. OD interventions and evaluation close University of Phoenix PSYCH 668 in Week 6, and here PSYCH/668 MS in Psychology students match interventions to diagnosed causes, involve employees in implementation and plan measures that test results. A composite human resources generalist in Tolleson writes the plan. She relies on a meta-analysis of OD interventions and attitudes, a meta-analysis of team building and a review of change research organized around content, context, process and criteria.

CoursePSYCH 668 Organizational Development, Leadership, and Management (PSYCH/668)
Week6
Paper typeOrganization development intervention plan
Lengthabout 1,164 words, 4 double-spaced pages plus title page and references
FormatAPA 7 student paper
SchoolUniversity of Phoenix
ProgramMS in Psychology
UpdatedOctober 2026

Free sample paper for PSYCH 668 Week 6

1

Predictable Schedules, Fairer Attendance Rules and Supervisors Measured on Retention: An OD Intervention Plan With Its Evaluation

[Student Name]

University of Phoenix

PSYCH/668: Organizational Development, Leadership, and Management

Week 6 Assignment

[Instructor Name]

[Date]

The distributor, its employees, the intervention and all figures are composites written for a model paper; research findings come from the sources listed.

What this part is doingThe title names the three main interventions so the reader sees the plan at once.
2

Last week's diagnosis traced day-shift turnover mainly to rigid schedules and attendance rules that clash with the lives of working parents, a clash made worse by supervisors judged only on rates, with pay a lesser factor. Feedback sessions on both shifts confirmed the findings; one picker said, "Finally somebody wrote it down." This paper proposes interventions and a plan to evaluate them.

Thinking About Change

Armenakis and Bedeian (1999) surveyed change research from the 1990s and sorted it into four groups of questions: content, meaning what is being changed; context, meaning the external and internal conditions surrounding the change; process, meaning the steps by which people put the change into practice; and criteria, meaning the outcomes used to judge success. They highlighted the importance of employee readiness and of explaining why change is needed, and noted that many change efforts fail because of process rather than content.

I use their framework to structure the plan: the content addresses diagnosed causes, the context includes a tight labor market and a president focused on efficiency, the process relies on the employee steering group and the criteria include turnover, attitudes and performance.

What this part is doingUsing the four issues as a frame keeps implementation and evaluation in view from the start.
3

What Research Says About Combining Interventions

Neuman et al. (1989) pooled studies of organization development interventions to see how much they shifted job satisfaction and related attitudes. Interventions combining several techniques generally produced stronger effects than single-technique interventions, and interventions focused on human processes, such as team building, tended to affect attitudes more than technostructural changes alone, with team building showing the strongest effects among single interventions.

Our diagnosis found causes at several levels: policies, supervision and crew climate. The research supports a combined approach rather than a single fix.

Intervention One: Predictable Schedules

Schedules will be posted two weeks ahead rather than four days ahead. Mandatory overtime will require twenty-four hours' notice except in genuine emergencies, which supervisors must log. A shift-swap system will let pickers trade shifts with approval from a lead rather than a manager. This addresses the largest gap found in the survey, schedule predictability.

Intervention Two: A Fairer Attendance Policy

The points system will remain, but each employee will receive three family emergency absences a year that carry no points, and points will expire after six months rather than twelve. The steering group helped design these changes, which address the cluster of departures following attendance warnings.

Intervention Three: Supervisor Development

Day supervisors will attend four two-hour sessions over two months on coaching conversations, handling family emergencies and running short crew meetings, with practice and follow-up observation. Ninety-day retention will be added to supervisors' goals alongside rates, and supervisors will receive authority to approve schedule swaps and family emergency absences. Without the change in goals and authority, training would teach supervisors to do things the formal system still discourages.

Training supervisors to be flexible is wasted if their goals still reward them only for rates.

Intervention Four: Crew Role Clarification and Buddies

Klein et al. (2009) meta-analyzed studies of team building and found moderate positive effects on team outcomes, with stronger effects for affective and process outcomes than for others. Among the four components examined, role clarification and goal setting produced the strongest effects.

Each day-shift crew will hold a facilitated session clarifying roles, such as who handles replenishment and who helps new pickers, and setting crew goals for accuracy and support. Every new hire will be paired with an experienced buddy for the first thirty days, aimed at the forty percent of departures that occur within ninety days.

What this part is doingChoosing the team building components the meta-analysis found strongest ties the intervention to evidence.
4

Implementation

Greg will announce the changes in person on both shifts, explaining that retention has become a company priority. I will coordinate implementation with the steering group. Weeks one through four cover policy changes and scheduling; weeks three through ten cover supervisor sessions; weeks five through eight cover crew sessions. A monthly review meeting with the steering group will identify problems and adjust.

Anticipating Resistance

Supervisors may resist new goals and fear that flexibility will hurt rates. Involving two supervisors in designing the training and showing them the cost of turnover will help. Night-shift employees may see day-shift changes as favoritism, so the policy changes will apply to both shifts. Greg may lose patience if rates dip; agreeing in advance on a three-month window before judging results reduces that risk.

Evaluation Design

The day shift works in two zones, produce and dry goods, with similar staff and turnover. The plan will start in the produce zone, with the dry goods zone beginning three months later. This staggered rollout gives a comparison: if ninety-day retention improves in produce but not yet in dry goods, and then improves in dry goods after its start, the intervention is a likely cause rather than seasonal hiring or a change in the labor market.

Criteria

Outcomes span several levels. Reactions: supervisor and crew session ratings. Attitudes: the same twenty-five-item survey repeated at three and six months. Behavior: schedule changes posted late, absences and swaps. Results: ninety-day retention, annual turnover, picking accuracy and overtime hours. Each turnover avoided saves about four thousand dollars in recruiting and training, so reducing day-shift turnover from 68 to 45 percent would save roughly eighty thousand dollars a year, against implementation costs of about twenty-five thousand.

What Would Count as Failure

An honest evaluation sets out, before results arrive, the evidence that would count against the plan. If ninety-day retention in the produce zone has not improved by at least ten percentage points after three months, or if improvement in produce is matched by the same improvement in dry goods before its rollout, the steering group will conclude that the interventions are not the cause of any change. If picking accuracy falls by more than a small margin, the company will review whether flexibility is being managed well. Stating these thresholds now protects the evaluation from being reinterpreted later by people who hoped for a particular answer.

What Greg Agreed To

Greg approved the plan with two conditions: a monthly one-page summary of results and the right to pause the attendance changes if absences rise sharply. Both conditions are reasonable. The summary will report retention, accuracy, overtime and absences by zone, and any pause will be discussed with the steering group before it takes effect.

Closing the Cycle

In keeping with action research, results will return to employees at three and six months, and the steering group will decide what to keep, change or stop. The plan is a first cycle, not a final answer, and a second round of diagnosis will follow if retention stalls or new problems appear on either shift.

Conclusion

Combined interventions targeting scheduling, attendance, supervision and crew roles, implemented with employee participation and evaluated through a staggered rollout, give the company a credible test of whether it can keep its day shift. Research on intervention effects and team building supports the choices, and the evaluation will show whether they work here.

5

References

Armenakis, A. A., & Bedeian, A. G. (1999). Organizational change: A review of theory and research in the 1990s. Journal of Management, 25(3), 293-315. https://doi.org/10.1177/014920639902500303

Klein, C., DiazGranados, D., Salas, E., Le, H., Burke, C. S., Lyons, R., & Goodwin, G. F. (2009). Does team building work? Small Group Research, 40(2), 181-222. https://doi.org/10.1177/1046496408328821

Neuman, G. A., Edwards, J. E., & Raju, N. S. (1989). Organizational development interventions: A meta-analysis of their effects on satisfaction and other attitudes. Personnel Psychology, 42(3), 461-489. https://doi.org/10.1111/j.1744-6570.1989.tb00665.x

What the PSYCH 668 Week 6 instructions ask

For the last week of PSYCH 668, students commonly design an organization development intervention and a plan to evaluate it. Prompts usually ask for interventions matched to a diagnosis, such as structural, human process, human resource or strategic interventions, an implementation plan with roles and a timeline, strategies for managing resistance and an evaluation design with measures collected before and after. Some versions ask for a return-on-investment estimate. Show how each intervention addresses a diagnosed cause, describe who will do what and when, explain how employees will take part and name the measures, the comparison and when results will be reviewed. Estimate costs where you can, and cite sources in APA style.

How this PSYCH 668 Week 6 example is built

Building on last week's diagnosis, Dana Whitfield writes an intervention plan for day-shift turnover at the Tolleson distributor. Interventions include schedules posted two weeks ahead with a shift-swap system, a revised attendance policy with a family emergency allowance, supervisor development with retention added to supervisors' goals and role clarification and a buddy system for new crews. A meta-analysis of OD interventions finds that combined interventions outperform single ones. A team building meta-analysis finds that role clarification and goal setting produce the strongest effects. A review of change research frames content, context, process and criteria. A staggered rollout across two zones provides a comparison for evaluation, and a cost estimate weighs savings against spending.

PSYCH 668 Week 6 grading rubric: where the points go

Intervention and evaluation plans earn credit for close links between diagnosis and interventions, realistic implementation and evaluation designs that can show results. Instructors look for each intervention to target a specific diagnosed cause, for implementation to include roles, timeline, resources and employee participation, for resistance to be anticipated and for evaluation to include baseline measures, a comparison and outcomes at several levels. Credit goes to drawing on research about which interventions work and to estimating costs and benefits. Interventions chosen because they are popular, or evaluations that measure only satisfaction, lose points. Use APA style throughout the paper, including the reference list.

PSYCH 668 Week 6 help: mistakes to avoid

Intervention plans often list popular programs, such as a training workshop or a recognition program, without showing how each addresses what the diagnosis found. Another frequent weakness is evaluation that measures only whether participants liked the intervention, not whether turnover or performance changed. Some students propose an evaluation with no comparison group or baseline, so any change could have other causes. Others forget implementation details such as who will train supervisors and when. Link every intervention to a cause, plan implementation with roles and dates, involve employees and design an evaluation with baseline data and a comparison. A tutor can help you pick a realistic comparison for an evaluation in one organization and choose its measures.

Related PSYCH 668 sample papers

Other PSYCH 668 week samples

More MS in Psychology sample papers

PSYCH 668 Week 6 questions, answered

What does PSYCH 668 Week 6 usually cover?

Organization development interventions, implementation planning and evaluating whether change efforts achieved their goals.

Where can I find a free PSYCH 668 Week 6 sample paper?

Above is the complete PSYCH 668 Week 6 intervention and evaluation plan for warehouse turnover, free.

What types of OD interventions are there?

They are often grouped as interventions on people and group processes, on structure and technology, on HR systems and on strategy.

Does team building work?

A meta-analysis found moderate positive effects, strongest for role clarification and goal setting components.

How can a change effort be evaluated within one company?

With baseline measures and a comparison, such as a staggered rollout in which some units start later than others.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official University of Phoenix document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.