Free sample paper for PM 570 Week 1
Six Functions, One Refrigerant Deadline: Leading the Cross-Functional Team That Redesigns a Rooftop Unit Line
[Student Name]
University of Phoenix
PM/570: Projects, Programs, and Portfolios
Week 1 Assignment
[Instructor Name]
[Date]
Red River Air Systems, its people, product line and figures are composites written for a model paper.
Red River Air Systems is a composite manufacturer in Wichita Falls, Texas, that builds light commercial rooftop air conditioning and heat pump units for restaurants, small offices and retail stores. Its three-to-five-ton line accounts for about 37 percent of its $410 million in annual revenue. Federal rules adopted under the American Innovation and Manufacturing Act require new light commercial air conditioning systems to move away from high-warming refrigerants such as R-410A toward alternatives with much lower global warming potential, most of which are classed as mildly flammable. Red River has chosen R-454B. The redesign project must deliver certified, production-ready units before the compliance date, or the company's dealers will turn to competitors already shipping compliant equipment. The project manager, Monique Barrett, leads a 14-person team that has never worked together. This paper analyzes how she should lead it.
The Strategic Stakes
The redesign is not a routine engineering change. It protects the company's largest product line, sets the design pattern for every other line that must convert and, if executed well, gives Red River a chance to win dealers from slower competitors. The project is also the first in what leadership expects to become a program of related conversions, the subject of Week 3. Leadership of this team therefore matters beyond the project: it will shape how the company's functions work together on the projects that follow.
The Team and Its Tensions
The core team includes four design engineers, a controls engineer, two manufacturing engineers, a plant supervisor, a quality and certification specialist, a supply chain manager, a sales engineer representing dealers, a service trainer and two engineers from the compressor supplier, who work from Georgia and join by video. Each function brings a legitimate priority. Engineering wants time to optimize efficiency. Manufacturing wants to change the assembly line as little as possible. Quality must satisfy a safety standard that requires refrigerant leak detection and mitigation for mildly flammable refrigerants in many installations. Supply chain worries about the availability of new sensors and valves. Sales wants dates it can promise. The supplier wants volume commitments before it dedicates production capacity.
These tensions are normal in cross-functional work, but the team also has no shared history. Engineers and plant staff have a long habit of blaming each other for late changes, and the supplier's engineers have never met anyone in the plant.
What the Research Says About Project Leadership
Müller and Turner (2010) studied the leadership competencies of successful project managers using a large international survey and found that emotional competencies such as conscientiousness, communication and sensitivity, together with managerial competencies, distinguished high performers, with the profile varying by project type and complexity. Their finding suggests that Barrett's technical credibility will not be enough on its own.
A comparison of project managers with line managers (Keegan & Den Hartog, 2004) found that transformational leadership was associated with employee commitment and motivation in both groups, although some relationships appeared weaker for project staff, whose ties to a project manager are temporary. The point for Barrett is that inspiring a shared purpose helps, but temporary teams also need clear structure and fair processes because loyalty to the project is not automatic.
Clarke (2010) examined project managers and found that aspects of emotional intelligence were associated with transformational leadership behaviors and with competencies such as teamwork and managing conflict. For a team with a history of blame between engineering and the plant, the ability to recognize and manage emotions in tense meetings is likely to matter as much as any formal process.
Inspiring the team is necessary; on a temporary team it is not sufficient without structure that feels fair.
A Leadership Plan
Barrett's approach combines three elements drawn from this evidence.
First, purpose and structure. At kickoff, the vice president of engineering will explain the strategic stakes directly, and the team will build a charter with decision rights that resolve recurring disputes: engineering owns design choices, manufacturing has a veto on any change after the design freeze unless the vice president overrides it and quality's certification requirements are fixed constraints. Clear rules reduce the room for blame.
Second, a shared mental model of the product. DeChurch and Mesmer-Magnus (2010) conducted a meta-analysis of team cognition and found that shared understanding among team members, of the task and of one another, was positively related to team processes and performance. Barrett will run a two-day workshop in the plant where design engineers, plant staff, the service trainer and the supplier's engineers build a prototype unit together and walk the leak detection sequence from sensor to shutdown. Each function will see what the others must solve.
Third, situational adjustment. Design engineers are experienced and self-directed; Barrett will set goals and stay out of their way. Plant supervisors face the greatest change, handling a mildly flammable refrigerant for the first time; she will be closely involved with them, bringing in safety specialists and ensuring their concerns change the design where necessary. The supplier's engineers will be treated as team members, with access to the same reviews and data, rather than as vendors receiving specifications.
Safety, Voice and Early Warning
The new refrigerant raises the stakes of silence. A plant worker who notices that brazing near a sensor harness could damage it, or an engineer who suspects a leak path, must speak up immediately. Edmondson (1999) found in a field study of work teams that shared beliefs about safety for interpersonal risk-taking were associated with learning behavior, which in turn related to performance. Barrett will model this by thanking people publicly for raising problems, will hold a short "what worried you this week" round in each weekly review and will make sure that problems raised early never become a reason for blame later.
Managing Conflict at the Boundaries
The most likely conflicts are engineering against manufacturing over late changes and Red River against the supplier over volume commitments. For the first, the design freeze date and the change rule in the charter provide a neutral reference, and Barrett will bring disputes into the open in the weekly review rather than letting them run through email. For the second, she will work with the supply chain manager and the vice president to offer a tiered commitment tied to the certification milestone, so the supplier sees a credible path to volume.
Judging Team Performance
Barrett will judge the team on outcomes and on how it works. Outcome measures are certification by the planned date, a pilot production run with first-pass yield above 95 percent and dealer training ready before launch. Process measures include the number of design changes after freeze, the time between a problem being found and being raised and a short monthly pulse survey on whether members feel heard. A rising number of late changes or a growing gap between when problems are found and when they are raised would signal that the leadership plan needs adjustment.
Conclusion
Leading Red River's redesign team means turning six functions and an outside supplier into a group that shares an understanding of the product and the stakes. Research on project leadership suggests combining purpose with fair structure, building shared mental models, adjusting to each group and creating the psychological safety that a flammable refrigerant demands. If Barrett succeeds, the company gains not only a compliant product line but a pattern of cross-functional work for the program of conversions that follows.
References
Clarke, N. (2010). Emotional intelligence and its relationship to transformational leadership and key project manager competences. Project Management Journal, 41(2), 5-20. https://doi.org/10.1002/pmj.20162
DeChurch, L. A., & Mesmer-Magnus, J. R. (2010). The cognitive underpinnings of effective teamwork: A meta-analysis. Journal of Applied Psychology, 95(1), 32-53. https://doi.org/10.1037/a0017328
Edmondson, A. (1999). Psychological safety and learning behavior in work teams. Administrative Science Quarterly, 44(2), 350-383. https://doi.org/10.2307/2666999
Keegan, A. E., & Den Hartog, D. N. (2004). Transformational leadership in a project-based environment: A comparative study of the leadership styles of project managers and line managers. International Journal of Project Management, 22(8), 609-617. https://doi.org/10.1016/j.ijproman.2004.05.005
Müller, R., & Turner, J. R. (2010). Leadership competency profiles of successful project managers. International Journal of Project Management, 28(5), 437-448. https://doi.org/10.1016/j.ijproman.2009.09.003
What the PM 570 Week 1 instructions ask
The opening PM 570 assignment typically asks graduate students to examine how a project manager leads a team through the project life cycle to meet strategic objectives. Prompts may ask students to describe the team and its context, evaluate leadership theories or styles that fit, explain how they would build trust, motivation and collaboration, address conflict and diversity of function or location and link the team's work to organizational strategy. Some versions ask for a leadership plan. Use a realistic organization and project, engage with leadership and teamwork research at a graduate level rather than definitions alone and support the analysis with peer-reviewed sources in APA format, aiming for evidence-based recommendations.
How this PM 570 Week 1 example is built
The sample paper follows a 14-person team charged with converting a manufacturer's best-selling three-to-five-ton rooftop line from a high-warming refrigerant to a mildly flammable lower-warming one before a federal deadline. It explains why the project matters to strategy: the line earns over a third of revenue, and a late conversion would hand dealers to competitors. The team spans engineering, manufacturing, quality, supply chain, sales and an outside compressor supplier, each with its own priorities. The paper reviews research on project manager leadership competencies, transformational leadership in projects and emotional intelligence, then sets a leadership plan built on a shared mental model of the product, psychological safety around flammability risk and different approaches for engineers, plant supervisors and the supplier.
PM 570 Week 1 grading rubric: where the points go
Graduate graders weigh analysis and evidence heavily. Excellent papers frame the team's work in strategic terms, describe the team's composition and tensions specifically and evaluate several leadership perspectives against the situation, citing empirical research rather than popular summaries. They translate theory into concrete leadership actions, address conflict and boundaries between functions and partners and explain how team performance and learning will be assessed. Critical engagement, noting limits of a theory or of the evidence, raises a paper's standing, as does a plan that names the first actions the leader will take in the opening weeks. Clear structure, precise writing at a graduate level and APA formatting throughout complete the strongest submissions.
PM 570 Week 1 help: mistakes to avoid
At this level, the most frequent weakness is choosing one leadership style and describing it. Compare at least two perspectives and argue which fits the situation, using research. Another problem is a team description so general it could apply anywhere; name the functions, their competing goals and the external partners. Students also leave strategy out, describing leadership as if the project had no business purpose. Tie the team's success to the organization's objectives. Some papers rely on textbooks or websites for leadership claims; use peer-reviewed studies. Finally, describe how you will know the team is working, not only how you will lead it. If you want feedback on whether your argument is graduate-level, a tutor can review your outline.
Related PM 570 sample papers
Other PM 570 week samples
- PM 570 Week 2: The Project Life Cycle
- PM 570 Week 3: Program Management
- PM 570 Week 4: Selecting and Balancing a Portfolio
- PM 570 Week 5: Benefits Realization Plan
More MBA sample papers
- MGT 571 Week 1: Agile Environments
- MGT 576 Week 1: Opportunity Identification
- MKT 554 Week 1: Buyer Behavior and Preference
- MKT 574 Week 1: Marketing Strategy and Customer Value
PM 570 Week 1 questions, answered
What does PM 570 Week 1 usually cover?
It usually covers leading a project team toward strategic objectives: team composition and dynamics, leadership theories suited to the project, trust, motivation, conflict and how team performance supports organizational goals.
Where can I find a free PM 570 Week 1 sample paper?
The Week 1 paper above, on leading a cross-functional team that redesigns a rooftop air conditioner line for a new refrigerant, is free to read in full.
Which leadership style is best for project managers?
Research suggests no single style is best; effective project managers adapt to the project type and team, combining clear direction with support, vision and emotional awareness.
What is psychological safety in a project team?
A shared belief that team members can raise concerns, admit mistakes and ask questions without fear of embarrassment or punishment, which supports learning and early problem detection.
How do project managers lead people they do not supervise?
By building shared goals, credibility and relationships, using expertise and information, involving functional managers and making each member's contribution visible.
Write yours, or have the desk draft it
This paper is an original model document written by our desk, not a submitted student paper and not an official University of Phoenix document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.