HCS 412 Week 2 Project Management Elements Example

Reviewed by Lenora Whitcombe, MSN, RN · University of Phoenix · Updated

This HCS 412 Week 2 example builds the core elements of a health care project, the charter, scope statement, work breakdown structure and responsibility matrix, and the finished paper follows below in APA 7 style. Project elements are what week two of University of Phoenix HCS 412 covers, and in HCS/412 this is where health administration students turn an approved idea into documents a team can manage. The sample continues with the composite 180-bed community hospital opening a six-bed sleep disorders center. It writes a one-page charter with objectives, sponsor, budget and milestones, a scope statement that states what is and is not included, a work breakdown structure that decomposes the center into seven deliverables and 30 work packages and a responsibility matrix that shows who does, approves and advises on each. It explains how a clinical practice guideline shaped the scope.

CourseHCS 412 Project Management for Health Care Professionals (HCS/412)
Week2
Paper typeProject planning documents
Lengthabout 1,019 words, 4 double-spaced pages plus title page and references
FormatAPA 7 student paper
SchoolUniversity of Phoenix
ProgramBS in Health Administration
UpdatedSeptember 2026

Free sample paper for HCS 412 Week 2

1

Charter, Scope and Work Breakdown: Turning a Board's Approval Into Seven Deliverables and Thirty Work Packages for a Hospital Sleep Center

[Student Name]

University of Phoenix

HCS/412: Project Management for Health Care Professionals

Week 2 Assignment

[Instructor Name]

[Date]

The hospital, the sleep center project and its figures are composites written for a model paper; standards and guidelines come from the sources listed.

What this part is doingThe title names the documents and the level of decomposition, so the reader knows how detailed the plan will be.
2

The board of a composite 180-bed community hospital approved a six-bed sleep disorders center with one sentence in its minutes: proceed with the sleep center as presented, within a capital budget of $1.24 million. That sentence authorized spending but told no one what to build, by when or who was responsible. This paper builds the elements that turn approval into a manageable project: a charter, a scope statement, a work breakdown structure and a responsibility matrix.

The Charter

In the standard's terms, the charter is the document that authorizes the project to exist and lets the project manager commit organizational resources to it (Project Management Institute, 2021). It fits on one page.

Charter Contents

Purpose: provide local diagnostic sleep testing to reduce waits and keep care in the community. Objectives: open a six-bed laboratory and a home testing service by September 30; keep capital spending within $1.24 million; cut the wait for testing from five months to less than 28 days by the sixth month of operation; perform 1,800 studies in the first year. Sponsor: chief operating officer. Project manager: planning office. Clinical lead: medical director of sleep medicine. Milestones: design approved in month two, construction complete in month seven, staff hired in month seven, first patient in month nine. Success criteria: objectives met with no patient safety event in the first 100 studies.

What this part is doingEvery objective in the charter carries a number and a date, so the project's success can be judged rather than asserted.
3

The Scope Statement: Included

Renovation of six sleep rooms, a monitoring station, a patient restroom and a consultation room. Polysomnography systems and home testing devices. Integration with the electronic health record for orders and results. Recruitment and training of technologists. Policies, procedures and emergency protocols. Payer credentialing and preparation for accreditation.

Why Home Testing Is in Scope

Kapur et al. (2017), in the American Academy of Sleep Medicine's clinical practice guideline, recommended that uncomplicated adults with signs and symptoms of moderate to severe obstructive sleep apnea may be diagnosed with either laboratory polysomnography or home sleep apnea testing using a technically adequate device, and that laboratory polysomnography be used for patients with significant cardiorespiratory disease and certain other conditions. Including home testing lets the center match each patient to the test the guideline supports, and it shortens the waiting list faster than six beds alone could.

The Scope Statement: Excluded

A pediatric program. Treatment services such as a durable medical equipment store. Dental sleep appliances. Renovation of the corridor outside the wing.

Assumptions and Constraints

Assumptions: two technologists can be recruited locally; the wing's electrical system supports the equipment; payers will credential the center within 90 days. Constraints: the outpatient clinics in the wing must remain open; infection control rules apply during construction. Writing assumptions down, and testing them early, guards against the optimism that inflates early plans (Flyvbjerg, 2014).

The Work Breakdown Structure

The work breakdown structure decomposes the total scope into deliverables and work packages (Project Management Institute, 2021). The top level is the sleep center. Seven deliverables sit below it.

Deliverables and Work Packages

1 Project management: charter, plan, status reports, closure. 2 Facility: design, permits, demolition, construction, finishes, inspection. 3 Equipment: specifications, vendor selection, purchase, installation, testing. 4 Information systems: order sets, results interface, scheduling template, security review. 5 Staffing: job descriptions, recruitment, hiring, orientation, competency validation. 6 Clinical operations: policies, emergency procedures, patient education, referral process. 7 Business readiness: payer credentialing, charge master, accreditation application, marketing to referring physicians. In all, 30 work packages, each small enough to estimate and assign.

What this part is doingThe breakdown is organized by what the project delivers, not by who does the work, which is the standard way to build it.
4

Numbering

Each package has a number, such as 2.3 for demolition, used in the schedule, budget and status reports so everyone refers to the same work the same way. When a status report says 2.3 is late, no one has to ask what that means.

How Deep to Decompose

The team stopped breaking work down when a package could be estimated with reasonable confidence, assigned to one owner and completed in no more than about four weeks. Construction, for example, was divided into demolition, rough-in of electrical and data lines, walls and ceilings, finishes and inspection, because a single construction package lasting four months could not be tracked. Equipment installation, by contrast, stayed as one package because the vendor completes it in a week.

The Work Breakdown Structure Dictionary

Each package has a short dictionary entry describing the work, its owner, its acceptance criteria and its estimated cost. The entry for 3.5, equipment testing, reads: the biomedical engineering team verifies each polysomnography system against the manufacturer's checklist and records one complete test study per room; accepted when all six rooms pass.

Stakeholder Register

The team also recorded each stakeholder's interest, influence and preferred communication. Pulmonologists have high influence and want monthly updates; clinic managers in the wing want advance notice of noisy work; payers need credentialing documents on their own timelines.

The Responsibility Matrix

For each package, the matrix names who is responsible, accountable, consulted and informed. Examples: construction, 2.4, facilities manager responsible and accountable, project manager consulted, medical director informed. Policies, 6.1, medical director accountable, lead technologist responsible, nursing and risk management consulted. Credentialing, 7.1, revenue cycle director accountable, project manager informed.

Rule of One Accountable Person

Each package has exactly one accountable person. Shared accountability usually means no accountability, because each party assumes the other is watching.

Protecting Scope

Scope creep in health care projects often arrives as a reasonable clinical request made in a hallway. Any addition to scope, such as the pediatric program some physicians still want, requires a written change request reviewed for its effect on schedule, cost and risk and approved by the sponsor.

How the Elements Connect

The charter authorizes, the scope statement bounds, the work breakdown structure organizes and the matrix assigns. Next week, each work package receives durations and dependencies to form the schedule.

Conclusion

A board's approval became a project the team can manage through a one-page charter with measurable objectives, a scope statement with clear exclusions, a work breakdown structure of seven deliverables and 30 work packages and a responsibility matrix naming one accountable person for each.

5

References

Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. Project Management Journal, 45(2), 6-19. https://doi.org/10.1002/pmj.21409

Kapur, V. K., Auckley, D. H., Chowdhuri, S., Kuhlmann, D. C., Mehra, R., Ramar, K., & Harrod, C. G. (2017). Clinical practice guideline for diagnostic testing for adult obstructive sleep apnea: An American Academy of Sleep Medicine clinical practice guideline. Journal of Clinical Sleep Medicine, 13(3), 479-504. https://doi.org/10.5664/jcsm.6506

Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide) (7th ed.). Project Management Institute.

What the HCS 412 Week 2 instructions ask

HCS 412 Week 2 typically asks students to develop or explain the key elements of a project plan. Prompts may cover the project charter, objectives, scope statement, deliverables, the work breakdown structure, stakeholder analysis, roles and responsibilities and the project management plan. Some versions ask students to use a scenario provided by the course or to begin a project they will continue in later weeks. Length varies with the documents, often three pages plus tables. Strong work writes measurable objectives, draws a clear boundary around scope, breaks deliverables down to manageable work packages and assigns responsibility so nothing falls between roles.

How this HCS 412 Week 2 example is built

The paper begins with the board's approval in one sentence and explains why that is not enough to start work. The charter follows: purpose, measurable objectives, sponsor, project manager, budget, milestones and success criteria. The scope statement lists what is included, what is excluded and the assumptions behind both, noting how a national guideline on sleep apnea testing justified including home testing. The work breakdown structure is presented as seven deliverables with their work packages and a numbering scheme. A responsibility matrix assigns roles for key packages. A section on how scope will be protected from creep closes the paper, setting up the schedule in Week 3.

HCS 412 Week 2 grading rubric: where the points go

This week is generally graded on the completeness and quality of the project documents. Faculty look for a charter with measurable objectives and clear authority, a scope statement that defines boundaries and assumptions, a work breakdown structure organized by deliverables and decomposed to a manageable level and clear assignment of responsibility. Linking scope decisions to evidence or requirements earns credit. Tables help, provided they are explained in the text, and consistent numbering across documents shows the plan hangs together. Writing and APA style account for the remainder. Documents with vague objectives, a work breakdown structure listing activities instead of deliverables or no statement of exclusions usually score lower than documents a team could actually use.

HCS 412 Week 2 help: mistakes to avoid

The usual trap in HCS 412 Week 2 is a work breakdown structure that reads like a to-do list. Organize it by deliverables, the things the project produces, then break each into work packages. Another is writing objectives such as improve access, which cannot be measured; state a number and a date. Students also forget exclusions, yet stating what is out of scope prevents most later arguments. Include assumptions, since they become risks if wrong. Assign one accountable person per package. Keep the charter short; it authorizes the project, while the plan manages it. Use the same numbers you will use in later weeks, because instructors often check consistency. Finally, explain your tables in the text so graders see your reasoning.

Related HCS 412 sample papers

Other HCS 412 week samples

More BS in Health Administration sample papers

HCS 412 Week 2 questions, answered

What does HCS/412 Week 2 usually ask for?

Many sections ask students to develop project elements such as a charter, objectives, a scope statement, a work breakdown structure and roles and responsibilities for a health care project.

Where can I find a free HCS 412 Week 2 sample paper?

The sleep center charter, scope and work breakdown paper above costs nothing to read, and its margin notes walk through every document. We write a first custom paper for your project free.

What is a RACI matrix?

A responsibility assignment chart showing who is Responsible for doing each task, who is Accountable for it, who is Consulted and who is Informed.

What should a scope statement include?

The project's deliverables, what is included and explicitly excluded, acceptance criteria, constraints and assumptions.

What is scope creep?

The gradual expansion of a project's scope without matching changes to time, budget or resources, often through small, unapproved additions.

Write yours, or have the desk draft it

This paper is an original model document written by our desk, not a submitted student paper and not an official University of Phoenix document. Read it for the moves, then write your own to the instructions in your classroom. If you want one built to your exact prompt and rubric, the first custom sample is free and arrives in 24 to 48 hours.